|
ANTAREJA RESOURCES owns and operates 3 (Three) units 3-Joint Electric Rig with Hight Temperature Hight Pressure criteria pruposely for Oil, Gas and Geothermal Drilling Services.
1. Rig#8 - 2000 HP JJ450/45-5
2. Rig#9 - 2000 HP JJ450/45-5
3. Rig#10 - 1500 HP JJ450/45-K
ANTAREJA RESOURCES with Rig#8 is currently being engage in developing Medco E&P's Singa Gas Field at Lematang Block PSC in South Sumatra which has highly sensitive HTHP criteria. With its newest and most modern state-of-the-art Drilling Rig with a total capacity of 2000HP, exploting the particular drilling project is privilege task.
|